Hetch Hetchy Water and Power reported on May 26 as follows:
Good morning,
HHWP will begin to make Holm Powerhouse generation “rafting releases” this Friday, May 28th. Increased generation will occur during the usual 07:00-11:00 AM period on weekends and weekdays (*NWW
exceptions noted below).
Flows below Holm will likely be much lower during hours outside this window due to low natural reservoir inflows.
All other reservoirs are at minimum in-stream release requirements. In summary:
As always, all flow rates are best estimates and are subject to change as operational needs or constraints arise.
Any significant changes to the schedule will be posted on the bulletin board.